grey-box-page
top-title-box
top-title-box
Grade/Switch Construction
Gage is 7 1/2" and the scale is 1 1/2" and 2 1/2".  It is interesting to note that everything for the layout is done on site;  bending tracks for 50 foot minium radius turns, and all ties, (recycled plastic:
1 1/2" x 1 1/2"), are cut and routed individually.  (The track has a tie about every 4-6 inches).
moving-dirt-for-grade
dirt-for-grade
Lots of dirt moving to keep the
grade suitable for Live Steam.
decisions
track-work-weld
With the rail bent, the welding
and switches are added.
putting-ballast-car-to-work
ballast-car-rest
Adding Ballast
start-of-grade
scruffy-tests-grade
It's starting to look like a Railroad!
The electric engine takes anxious riders for a ride around Kelly's Loop.
train-grade-construction
corner-train
Pacific Beach and Summit Railroad
black-box
Home

Development

Grade Construction

M.O.W.

Roster

EVENTS

Rules

ALL ABOARD!

Life and Times

Railroad Links

Telegraph us!
(Via email)


Privacy Policy

Sitemap
back-train
next-train